Home One Page
  • Home
  • .
  • Portfolio Details
  • .

Case Study – Caseville Public Schools

// RESIDENTIAL DEVELOPMENT

Caseville Public School

Not ready for a call? Take our 10-Question Project Survey →
Caseville Public Schools
Design trans
Design
Thoughtful spaces with intentional details.
Arrow Trans
Flow trans
Flow
Smart space planning with seemless movement.
Arrow Trans
Functionality trans
Functionality
Fitness spaces that work today – and for years to come.

The Challenge

This project required balancing several priorities. The existing equipment was outdated, the long, narrow footprint limited layout options, and the space needed to comfortably support both student classes and staff workouts. Our goal was to incorporate the school’s equipment wish list while maximizing functionality, maintaining proper clearances, and creating a safe, efficient fitness environment.

Discovery

Through our consultation and site evaluation, we identified several priorities

  • Upgrade all equipment
  • Support Multiple user groups
  • Maximize a Challenging Layout
  • Accommodate a Specific Equipment Wish List
  • Create a Flexible Training Environment
  • Maintain proper safety clearances
The Existing Space
Caseville Public Schools - before photo
The Concept
Caseville Public Schools
The Final Product
Caseville Public Schools
Design trans
DESIGN

We centered the layout around the room’s natural corridor, creating clear sightlines and easy circulation throughout the space. Commercial-grade Nautilus Instinct strength equipment, paired with StairMaster and Star Trac cardio, provides a durable, low-maintenance solution built for daily student use.

Flow trans
FLOW

The room was organized into two distinct training zones, leaving the center open for programming, instruction, and movement. Larger fixed equipment anchors each end of the room, creating an intuitive layout that minimizes congestion.

Functionality trans
FUNCTIONALITY

A dedicated free weight and bar training area is complemented by strength machines grouped by movement pattern, creating a logical progression through the space while supporting both individual workouts and class instruction.

The Solution

Our design transforms the central corridor into a versatile training area that accommodates class programming while preserving clear pathways and natural movement throughout the space.

 

• Natural traffic flow when entering the room via the primary doors. 

• Two distinct Strength Zones featuring Nautilus Instinct sectorized machines, Half racks and Smith Machines.

• Flex space that allows for proper safety clearances and class programming. 

• Cardio Zone featuring Star Trac 8 Series Treadmill, 8 Series Elliptical, Stairmaster 10GX Stair climber, and Throwdown HIIT Bike.

Caseville Public Schools

Project Snapshot

space size
Space Size

1,200 sq ft

Equipment installed
Equipment Installed

26

user capacity
User Capacity

20+

timeline
Timeline

90 days

installation time
Installation Time

3 day

The Results

// EXERCISE WAREHOUSE

Your Fitness Center, Made Easy.

Project Survey

Not ready for a call? Take our 10-Question
Project Survey →

Municipal Fitness

Exercise Warehouse Showrooms

Hours

Cart (0 items)
Our Hours
Exercise Warehouse Showrooms